Structural engineer Nicola Perandin from the London-based Arup Design Team visited the campus for a week in September 2010 and examined each and every building and piece of infrastructure. Although the mudslide caused considerable internal damage and destroyed a lot of equipment, the only structural damage he found was an end wall of the Junior South Block that is 3cm out of vertical at the top.