Resident Landscape Architect Weekly Report 6th to 12th August 2013

Written by

in

weekly report 060813 1

Arlene Decker (landscape volunteer) inspecting an irrigation system manhole

Construction this week has simply involved ‘mending’ with a small amount of construction in the form of building the manholes for the valves for the irrigation system. I was very pleased about the manholes given the exposed nature of the valves to children and to the sand/soil gradually falling into the trenches and covering the mechanism. We have not lost anymore plants this week. The trees and plants that have ‘taken’ continue to develop and flourish in the harsh climate and the housemothers are watering which is helping hugely. We are looking for local plants to cultivate on site.

weekly report 060813 2

Wild Aquilegia photographed at Chilling

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *